The thinking behind the technology…

...came from you, the customer. Coldharbour consulted Tanker operators around the world and from these consultations a list of “must have” features for the new system was compiled:

  • The system must not disrupt normal ship operations
  • The system must be rugged, reliable and suitable for life on board a Tanker
  • The system must not require upgrades to on-board power generation capacity
  • The system must not require upgrades to ballast pumps or piping
  • The system design must allow for gravity ballasting and de-ballasting
  • There must be no ballast water filtration requirements
  • There must be no specialist maintenance requirements
  • The system must be simple to use by crew members with IGG experience
  • The system must have a small footprint
  • The system must have low running costs
  • The BWT IGG system must be available for cargo blanketing duty (if so required)
  • The system must be future proof – able to respond to and meet tightening regulations
  • The system must be able to deal with the problem of bacterial regrowth in ballast tanks
  • The system must offer corrosion reduction in the ballast tanks
  • The system must be safe for crew and environment in the event of misuse
  • The system must not use chemicals or active substances – G8 approval type is preferred.
  • The system must not disrupt normal ship operations (It’s so important, you said it twice!)